Saturday, 30 January 2016

Mr Judge Feedback - Provisional Mark/Level/Grade: Level 3 (13/20)


  1.  • Planning and research evidence will be complete;

  2.  There is proficient research into similar products and a potential target audience;

  3.  There is proficient organisation of actors, locations, costumes or props;

  4. There is proficient work on shotlists, layouts, drafting, scripting or storyboarding;

  5. • There is a good level of care in the presentation of the research and planning

6• Time management is good.

Interim grade: Level 3: 13/20 Level

Medal:
  1. Jordan, your blog has improved a lot over the last few weeks. You have made a number of very good posts of a good standard.
  2. Good work on your storyboards - could possibly add some more archive images to build a picture of the whole plot
  3. Good synopis and your spelling has improved a lot
  4. Watch the diamante spelling throughout
  5. DS Studio logo could do with some improvements, to make it more visually appealing
  6. Excellent script and ideas in evidence
  7. You have improved your textual anakysis as well
Mission: To get a level 4:
  1. Evidence of the BFI audience research required asap
  2. Evidence of images from the set, of costumes, location reeces, images/video of the making/behind the scenes
  3. Possibly some more 'fleshed out' mind mapping of initail ideas, Task 3
  4. Comb through your posts and make sure you can add more details throughout



MINIMAL (L1)
BASIC (L2)
PROFICIENT (L3)
EXCELLENT (L4)
TOTAL
1.RESEARCH & PLANNING
[20]
0-7
8-11
12-15
16-20
13
2. CONSTRUCTION – MAIN TASK
[40]
0-23
24-35
36-47
48-60
3.EVALUATION
[20]
0-7
8-11
12-15
16-20
TOTAL GRADE FOR
FOUNDATION PORTFOLIO [100]
/100
Minus -39 = U
40-49 = E
50-59 = D
60-69 = C
70-79 = B
80-100 = A


 

Monday, 4 January 2016

Production Schedule

Wednesday 6th January -  Filming the first couple of scenes in the town centre with Tom And Jordan T acting and Jordan C filming, we do not need permission to film here. These shots will be outside shots and be long shots and medium shots for the opening scene.

Monday 11th January -  Finish off all the filming that is needed for our open sequence, this will be filmed in the school so we do not need permission here and Jordan C will be filming.  The shots filmed will be more close up shots and

Wednesday 13th – Mock Exam

Monday 18th – Start the edit for our opening sequence and add the intro sequences, this will be done at school and done by the three of us so that the editing is kept between us and we then know how to edit.

For filming we will need a HD camera so that we can film all the shots that are needed and also get a tri pod so we can use them for steady shots when filming to make it more professional.

When filming there will be no real risk as we will be filming outside in the town centre where there is no real danger for us to film and also in the sixth form there is no danger for us to film.